JUMP  Concrete

McAlvain served as the concrete contractor for the Superstructure and Phase 1 of the Below Grade Parking Garage of Jack’s Urban Meeting Place (JUMP).  The Below Grade Parking Garage is a 190,000 sq ft cast in place concrete parking garage designed to independently support the multi-story JUMP Building to be constructed above.  Details of the 65,000 sq ft 6 level Superstructure includes approximately 90,000 sf of Post-Tensioned Decks, Double Reversing Helix Ramp Structure and Grand Pioneer Staircase.

Capabilities Utilized:

  • Concrete Contractor
  • Concrete: 27,000 CY